WMATA Platform 3 Improvement Project

ASC was contracted to design and provide electrical distribution and control equipment for WMATA (Washington METRO Area Transit Authority). This project included multiple Pumping Station and Fan Ventilation Systems in the DC quadrant. The rigorous challenges of mile marker checkpoints and multi system coordination were expertly handled by the ASC engineering and management teams in order to facilitate successful commissioning and deployment of the provided solutions and equipment while delivering on time even when facing procurement challenges due to COVID 19 pandemic.